A check dam, constructed at a cost of 4.5 million Afghanis, was officially delivered to Gati Akhistani in Maidan Wardag. In the Daimirdad district of Maidan Wardag province, a check dam measuring 56 meters in length and 8 meters in width was constructed and initiated, funded by the development allocation from the Ministry of […]
A check dam, constructed at a cost of 4.5 million Afghanis, was officially delivered to Gati Akhistani in Maidan Wardag.
In the Daimirdad district of Maidan Wardag province, a check dam measuring 56 meters in length and 8 meters in width was constructed and initiated, funded by the development allocation from the Ministry of Water and Energy.
there is no tags in this article.
دیدگاه بسته شده است.